Practical schedule risk analysis / David T. Hulett.

Por: Hulett, David TTipo de material: TextoTextoEditor: Farnham, England ; Burlington, VT : Gower Pub. Co., c2009Descripción: xiv, 223 p. : il. ; 26 cmISBN: 9780566087905 (alk. paper); 0566087901 (alk. paper)Tema(s): CULTURA CORPORATIVA | ADMINISTRACIÓN DE RIESGOSClasificación CDD: 658.155
Contenidos:
List of Figures vii List of Tables xi Preface xiii Chapter 1 Why Schedule Risk Analysis? Looking Beyond the Critical Path Method 1 Chapter 2 Uncertainty in Activity Durations: Using Probability Distributions 9 Chapter 3 Uncertainty Along a Schedule Path: Using Monte Carlo Simulation 29 Chapter 4 A Good Project Schedule is Needed: Critical Path Method Scheduling 101 47 Chapter 5 Collecting Risk Data: Exploring Methods and Problems 71 Chapter 6 Where Parallel Paths Merge: Introducing the ‘Merge Bias’ and Risk Criticality 99 Chapter 7 Probabilistic Branching: Analyzing Discrete Risk Events 115 Chapter 8 Using Risks to Drive the Analysis and Prioritize Risks: Introducing the ‘Risk Driver’ Method 133 Chapter 9 Schedule Contingency Plans: Using Conditional Branching 163 Chapter 10 When Activity Durations Move Together: Incorporating Correlation 179 Chapter 11 Risk Management in the Organization: Identifying the Mature Risk Management Culture 201 Appendix 1 The Problem with PERT 207 Index 219
Resumen: Se requiere la programación de proyectos para la buena gestión de proyectos, así como el calendario representa el plan del proyecto en un conjunto específico de supuestos, a menudo que va a evitar nuevos riesgos o incluso aquellas que han ocurrido en ocasiones anteriores. El Método del Camino Crítico (CPM) horario típico supone que el equipo de proyecto sabe cuánto tiempo tomarán las actividades programadas. Sin embargo, el jefe de proyecto con experiencia sabe que los valores de duración de manera tan precisa indicados son en realidad sólo estimaciones basadas en supuestos que podrían ser mal. Un análisis de riesgos horario explora las implicaciones para el calendario del proyecto de riesgo para las duraciones de las actividades y también identifica los riesgos de programación más importantes. Este análisis, sobre la base y que se extiende la programación CPM, dará lugar a una estimación más precisa de finalización y proporcionar una oportunidad temprana para la planificación de acciones efectivas de mitigación de riesgos.
Etiquetas de esta biblioteca: No hay etiquetas de esta biblioteca para este título. Ingresar para agregar etiquetas.
    Valoración media: 0.0 (0 votos)
Tipo de ítem Ubicación actual Colección Signatura Info Vol Copia número Estado Fecha de vencimiento Código de barras Reserva de ítems
LIBRO - MATERIAL GENERAL LIBRO - MATERIAL GENERAL Biblioteca Jorge Álvarez Lleras
Fondo general
Colección / Fondo / Acervo / Resguardo 658.155 H912p (Navegar estantería) Ej. 1 1 Disponible 024077
LIBRO - MATERIAL GENERAL LIBRO - MATERIAL GENERAL Biblioteca Jorge Álvarez Lleras
Acervo general de Libros 658.155 H853p (Navegar estantería) Ej. 2 2 Disponible 021140
LIBRO - MATERIAL GENERAL LIBRO - MATERIAL GENERAL Biblioteca Jorge Álvarez Lleras
Fondo general
Colección / Fondo / Acervo / Resguardo 658.155 H912p (Navegar estantería) Ej. 3 3 Disponible 024093
Total de reservas: 0

Incluye bibliografía e indices

List of Figures vii
List of Tables xi
Preface xiii
Chapter 1 Why Schedule Risk Analysis? Looking Beyond the Critical Path Method 1
Chapter 2 Uncertainty in Activity Durations: Using Probability Distributions 9
Chapter 3 Uncertainty Along a Schedule Path: Using Monte Carlo Simulation 29
Chapter 4 A Good Project Schedule is Needed: Critical Path Method Scheduling 101 47
Chapter 5 Collecting Risk Data: Exploring Methods and Problems 71
Chapter 6 Where Parallel Paths Merge: Introducing the ‘Merge Bias’ and Risk Criticality 99
Chapter 7 Probabilistic Branching: Analyzing Discrete Risk Events 115
Chapter 8 Using Risks to Drive the Analysis and Prioritize Risks: Introducing the ‘Risk Driver’ Method 133
Chapter 9 Schedule Contingency Plans: Using Conditional Branching 163
Chapter 10 When Activity Durations Move Together: Incorporating Correlation 179
Chapter 11 Risk Management in the Organization: Identifying the Mature
Risk Management Culture 201
Appendix 1 The Problem with PERT 207
Index 219

Se requiere la programación de proyectos para la buena gestión de proyectos, así como el calendario representa el plan del proyecto en un conjunto específico de supuestos, a menudo que va a evitar nuevos riesgos o incluso aquellas que han ocurrido en ocasiones anteriores. El Método del Camino Crítico (CPM) horario típico supone que el equipo de proyecto sabe cuánto tiempo tomarán las actividades programadas. Sin embargo, el jefe de proyecto con experiencia sabe que los valores de duración de manera tan precisa indicados son en realidad sólo estimaciones basadas en supuestos que podrían ser mal. Un análisis de riesgos horario explora las implicaciones para el calendario del proyecto de riesgo para las duraciones de las actividades y también identifica los riesgos de programación más importantes. Este análisis, sobre la base y que se extiende la programación CPM, dará lugar a una estimación más precisa de finalización y proporcionar una oportunidad temprana para la planificación de acciones efectivas de mitigación de riesgos.

No hay comentarios en este titulo.

para colocar un comentario.