Integrated cost-schedule risk analysis / David Hulett.

Por: Hulett, David TTipo de material: TextoTextoEditor: Farnham, Surrey ; Burlington, VT : Gower, c2011Descripción: xix, 218 p. : il. ; 25 cmISBN: 9780566091667 (hbk. : alk. paper); 0566091666 (hbk. : alk. paper); 9781409428121 (ebook); 1409428125 (ebook)Tema(s): CONTROL DE COSTOS | ADMINISTRACIÓN DE RIESGOS | ADMINISTRACIÓN DE PROYECTOS -- COSTOSClasificación CDD: 658.1552
Contenidos:
Why conduct risk analysis? -- Cost risk analysis: the basics -- What is Monte Carlo analysis and how does it apply? -- Collecting high quality data on cost risk methods and challenges -- The correlation between common project element costs -- Using risk register risks to drive the cost risk analysis -- Preparing for integrated cost and schedule risk analysis -- Essentials of integrated cost and schedule risk analysis -- Integrated analysis method and case study basic results -- Integrated cost and schedule risk analysis advanced results -- Summary of integrated cost and schedule risk analysis.
Resumen: Los administradores de proyectos tienden a creer que sus estimaciones de costos - si han superado los presupuestos en el pasado o no. Es peligroso para aceptar las estimaciones de costos de ingeniería, que suelen ser optimista o poco realista. Aunque las estimaciones de costos incorporan reservas para contingencias por debajo de la línea, estas estimaciones de las reservas a menudo no se benefician de una evaluación rigurosa de los riesgos a los costos del proyecto. Los riesgos a los costos provienen de múltiples fuentes, incluyendo la duración del proyecto incierto, que a menudo se pasa por alto en el análisis de riesgos de costos. En resumen, la experiencia demuestra que la estimación de costos en los proyectos rara vez tiene éxito - sobrecostos ocurren rutinariamente.
Etiquetas de esta biblioteca: No hay etiquetas de esta biblioteca para este título. Ingresar para agregar etiquetas.
    Valoración media: 0.0 (0 votos)
Tipo de ítem Ubicación actual Colección Signatura Info Vol Copia número Estado Fecha de vencimiento Código de barras Reserva de ítems
LIBRO - MATERIAL GENERAL LIBRO - MATERIAL GENERAL Biblioteca Jorge Álvarez Lleras
Fondo general
Colección / Fondo / Acervo / Resguardo 658.1552 H912i (Navegar estantería) Ej. 1 1 Disponible 024078
LIBRO - MATERIAL GENERAL LIBRO - MATERIAL GENERAL Biblioteca Jorge Álvarez Lleras
Fondo general
Colección / Fondo / Acervo / Resguardo 658.1552 H912i (Navegar estantería) Ej. 2 2 Disponible 024094
Total de reservas: 0
Navegando Biblioteca Jorge Álvarez Lleras Estantes, Ubicación: Fondo general, Código de colección: Colección / Fondo / Acervo / Resguardo Cerrar el navegador de estanterías
658.155 NTC-ISO 31000 Gestión del riesgo: 658.155 NTC-ISO 31000 (2011) Gestión del riesgo: 658.1552 H912i Integrated cost-schedule risk analysis / 658.1552 H912i Integrated cost-schedule risk analysis / 658.2 S853m Manufacturing facilities : 658.23 H371f 3a ed. Facilities design / 658.3 A735a Armstrong's handbook of human resource management practice /

Incluye bibliografía e indices

Why conduct risk analysis? -- Cost risk analysis: the basics -- What is Monte Carlo analysis and how does it apply? -- Collecting high quality data on cost risk methods and challenges -- The correlation between common project element costs -- Using risk register risks to drive the cost risk analysis -- Preparing for integrated cost and schedule risk analysis -- Essentials of integrated cost and schedule risk analysis -- Integrated analysis method and case study basic results -- Integrated cost and schedule risk analysis advanced results -- Summary of integrated cost and schedule risk analysis.

Los administradores de proyectos tienden a creer que sus estimaciones de costos - si han superado los presupuestos en el pasado o no. Es peligroso para aceptar las estimaciones de costos de ingeniería, que suelen ser optimista o poco realista. Aunque las estimaciones de costos incorporan reservas para contingencias por debajo de la línea, estas estimaciones de las reservas a menudo no se benefician de una evaluación rigurosa de los riesgos a los costos del proyecto. Los riesgos a los costos provienen de múltiples fuentes, incluyendo la duración del proyecto incierto, que a menudo se pasa por alto en el análisis de riesgos de costos. En resumen, la experiencia demuestra que la estimación de costos en los proyectos rara vez tiene éxito - sobrecostos ocurren rutinariamente.

No hay comentarios en este titulo.

para colocar un comentario.

Haga clic en una imagen para verla en el visor de imágenes